Davy Sukamta & Partners was invited to the Balmoral Tower project through a design-build scheme with China State Construction. The occasion arose from a past project collaboration. Our engineering services include value engineering design while maintaining strict compliance to all applicable Indonesian National Standards (SNI).
Construction of mat and pile cap components at the base of the Balmoral tower started in May 2022. Currently, construction of the tower has reached 14th floor and is expected to be topped-off mid-year of 2024.