The MIG Data Center facility project requires an extensive structural engineering design since the building falls into seismic risk category III. This means it requires higher seismic design force to achieve the building safety to comply with the code requirement.
The data hall hosting the server racks requires a large space and heavy load-bearing design, requiring a careful approach to achieve a structural design that is cost-efficient, has adequate strength, and stiffness.
The project consists of 6 floors, 1 mezzanine floor, and 1 layer of basement, with a total constructed area of approximately 23,748 square meters.
The construction of the MIG Data Center facility project has been progressing steadily. As of December 31st, 2022, the project has been topped-off.