The JAC Jatibaru Project represents a transformative mixed-use development strategically located in Jakarta’s bustling urban core. This project consists of two distinct yet complementary structures: a soaring 38-story office tower set atop a 10-level split-level car park and a dynamic 7-story retail building, both sitting on a 3-level basement.

 

Davy Sukamta & Partners has been appointed as the structural and geotechnical engineer for this landmark development. In addition to our design role, we are also entrusted with technical supervision services to support the construction management team in ensuring rigorous quality assurance throughout execution. This integrated involvement not only reinforces our commitment to safety, precision, and overall project excellence, but also reflects the client’s strong commitment to delivering a high-quality and reliable development. In a market where not all clients are willing to allocate additional resources for enhanced supervision, this decision highlights their dedication to long-term performance and user safety.

 

Given the extremely soft soil conditions encountered down to a depth of 28 meters from the surface, our team implemented a comprehensive secant pile retaining wall system to ensure excavation stability.

 

The system features 1,180 mm diameter piles with full casing, providing exceptional strength and support for the deep excavation required.

 

Key Construction Milestones (as of mid-2025):

 

Secant pile, bored pile, and steel kingpost works have been fully completed. These elements are critical components enabling the top-down construction approach, allowing basement structures to be built progressively from the top downward.

 

Partial casting of the ground floor (GF) has been completed. This marks a key milestone in basement construction progress.

 

Our active role in technical supervision, combined with advanced engineering solutions, supports the project’s progress toward achieving high standards of safety and quality. We remain committed to continuous improvement throughout construction and look forward to sharing further updates as this landmark project continues to shape Jakarta’s skyline.

Related Projects

UID Lodge

Hotels

Bumi Residence By Pakubuwono

Apartments

Canggu Hotel Batu Bolong

Hotels

Harris Summarecon Serpong

Hotels

Vice President Palace Complex of Nusantara IKN, KALIMANTAN

Offices

Puri Indah Hotel and Parking Building

Hotels Transports

Balmoral Tower Project at Opus Bay, BATAM

Apartments

Hotel at Bandung

Hotels

  • Location

    Jakarta
  • Year

    2024 (Under Construction)
  • Architect

    Airmas Asri
  • Piling Contractor

    Bauer Pratama Indonesia
  • Contractor

    Shimizu Total Joint Operation
  • Building Height

    218 m
  • Basement Depth

    12 m
  • Site Area

    18,000 m²
  • Floor Area

    170,000 m²
  • Scope of Work

    Geotechnical Engineering and Structural Engineering