The design of ‘the world-famous international engineering firm’ uses prestressed post-tensioned beams in one direction with steel beams in the other direction. Concrete cores were used for the lateral system. Given the soft soil condition, this solution resulted in huge pile caps and 3.900 pieces of diameter 500 mm spun piles.
With design experience across multiple large projects and innovative design, we are proud to say that we reduced the cost of the structure by 60 billion rupiah (4.2 million USD) This was done by altering the structural system and using reinforced concrete in all construction.