The design of ‘the world-famous international engineering firm’ uses prestressed post-tensioned beams in one direction with steel beams in the other direction. Concrete cores were used for the lateral system. Given the soft soil condition, this solution resulted in huge pile caps and 3.900 pieces of diameter 500 mm spun piles.

 

With design experience across multiple large projects and innovative design, we are proud to say that we reduced the cost of the structure by 60 billion rupiah (4.2 million USD) This was done by altering the structural system and using reinforced concrete in all construction.

 

Related Projects

Grand Outlet Bali

Retails

Opus Bay Retail

Retails

Thamrin City

Hotels Mixed Use Offices Retails

Pondok Indah Mall 3 and Office Towers

Mixed Use Offices Retails

The Paragon Solo

Apartments Mixed Use Retails

The Manhattan Medan

Apartments Mixed Use Retails

TransPark Juanda

Apartments Community Hotels Mixed Use Offices Retails

Indonesia 1 Tower

Apartments Mixed Use Offices Retails

Previous Project

  • Location

    Surabaya
  • Year

    2006
  • Client

    UE-ASSA
  • Architect

    Envirotech Indonesia
  • Floor Area

    210,000 m²