This construction is the first building among five towers. Located in Jalan Raya Boulevard Gading Serpong, the 11-storey reinforced concrete structure has a 2-level podium
The structural system is a reinforced concrete core wall with open frames sitting on a 45 by 45 centimetres precast pile, 12 metres long, installed by a jacked-in method.